Fuzzy Mathematical Model For Optimizing Success Criteria Of Projects: A Project Management Application
Keywords:
Project Management, Criteria Optimization, Fuzzy Mathematical ModelAbstract
It is well known over the recent years that measuring the success of projects under the umbrella of project management is inextricably linked with the associated cost, time, and quality. Most of the previous researches in the field assigned a separate mathematical model for each criterion, then numerical methods or search techniques were applied to obtain the optimal trade-off between the three criteria. However in this paper, the problem was addressed by linear multi-objective optimization using only one fuzzy mathematical model. The three criteria were merged in a single non-linear membership function to find the optimal trade-off. Finally, the proposed model is tested and validated using numerical examples.
References
Babu, A.J.G and Suresh. N., project management with time, cost, and quality–European J. Operations Research,-1996,320-327.
Do Ba KHang, Yin Mon Myint, "Time cost and Quality trade-off in project management: case study", International Journal of Project Management, vol,17,No,1999,pp,249-256.
Hamdy A. Taha.,2007-Operations Research: An introduction., University of Arkansas, Fayetteville,813.
Kaheled El-Rayes, Amr Kandil, Time-cost-quality trade-off analysis for highway construction, Journal of Construction. Engineering Management, 2005 477-485.
Shrivastava. R, Singh.S and G. C. Dubey, India: Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Int. J. Contemp. Math. Sciences, Vol. 7, 2012, no. 16, 773 – 784.
A. Afshar, A. Kaveh and O.R. Shoghli, Multi Objective Optimization of Time Cost Quality Quantity Using Multi Colony Ant Algorithm, Iran, Asian, journal of civil engineering vol. 8, no. 2 (2007)-113-124.
Kagade., K.L. and Bajaj., V.H,fuzzy method for solving multi-objective assignment problem with interval cost, journal of statistics and Mathematics,vol.1,issue1,2010,pp:1-9.
P.K.De and DhartiYadav, An algorithm to solve multi –Objective assignment problem using interactive fuzzy Goal programming approach, Int.J. Contemp. Math. Sciences, vol.6,2011, no.34,1651-1662.
P.Biswas And S. Pramanik, Multi-Objective Assignment problem with Fuzzy Costs for the Case of Military Affairs, International Journal of Computer Applications, vol 30-No,10,September 2011.
BodkheS.G.,BajajV.H,Fuzzy Programming technique to solve bi-objective transportation problem, international journal of machine-intelligence, vol 2,issue 1,2010,pp:46-52.
N. Ganapathy Ramasam, I. Mohamed Shaik Hameed, P. Ajai and Priya Sera Varkey,-November 2016, A Correlated Study between Time and Cost in Accordance with Fuzzy Logic, Indian Journal of Science and Technology, Vol 9(44), DOI: 10.17485/ijst/2016/v9i44/98800
S. M. Mirmohseni, S. H. Nasseri, and A. Zabihi., 2017- An Interactive Possibilistic Programming for Fuzzy Multi Objective Solid Transportatio Problem, Applied Mathematical Sciences, Vol. 11, 2017, no. 45, 2209 – 2217
Ehsan Ehsani, Nima Kazemi, Ezutah Udoncy Olugu, Eric H. Grosse, Kurt Schwindl., 2016- Applying fuzzy multi-objective linear programming to a project management decision with non-linear fuzzy membership functions, Neural Computing and Applications. . 10.1007/s00521-015-2160-0.
J.Singh, fuzzy logics and fuzzy sets theory based multi-objective-Decision Making, Modeling Tool generalized for planning for Sustainable Water Supply, Institute of Town Planners, India Journal, 3,July-September 2011,73-80.
kagadeK.L .and BajajV. H, Fuzzy approach with linear and some non-Linear membership functions for solving multi-objective assignment problems, advances in computational research, vol1,issue,2,2009 pp:14-17.
P.K.De,A General Approach for Solving assignment problems Involving with Fuzzy Costcoefficients,vol,6,No,3:March 2012.
S.Behera and J. Nayak, Solution of multi-objective Mathematical programming problems in fuzzy approach, vol 3 No,12 December 2011.
Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards,. Elsevier Science & Technology Books,431.
Frederick S., Mark S., 2011- PERT/CPM Models for Project Management. In: Introduction to Management Science, Universityof Washington, PP:1-22.
Downloads
Published
How to Cite
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
Authors contributing to this journal agree to publish their articles under the Creative Commons Attribution 4.0 International License, allowing third parties to share their work (copy, distribute, transmit) and to adapt it, under the condition that the authors are given credit and that in the event of reuse or distribution, the terms of this license are made clear.